Building construction
Residence Erbenova, Prague
On the project Rezidence Erbenova we supplied a complex set of locksmith elements for a residential building in Smíchov. The implementation included external railings, internal staircases and other related elements that had to be coordinated with the architecture of the building and the interior detail requirements.
The project is important to us mainly because of the scope and variability of delivery. In addition to the communal areas, we also tackled the mezzanine staircases, where clean detail, precise anchoring and quality craftsmanship were key.
The Flow Building Václavské náměstí 47
On The Flow Building project, we carried out a complete delivery of steel and locksmith constructions, including the steel structure for the so-called crown of the building, which carries an architecturally distinctive, shape-demanding façade rising above the line of Wenceslas Square. This part of the construction placed extraordinary demands on precision manufacturing, tolerance control and coordination with the author of the facade design. As part of the project, we also supplied more than 300 metres of all-glass railings on the roof terraces, internal railings on the staircases and other related locksmith elements throughout the building.
Škoda Auto - Central Kitchen
In 2020, we delivered over 280 tonnes of steel structures for the construction of the new Central Kitchen building on the Škoda Auto site in Mladá Boleslav, which houses a modern, large-capacity cooking plant.
Items supplied include the process steel structure on the roof of the building (pictured, 160 tonnes), replacements for doors and windows (25 tonnes), ceiling reinforcement, double floors, lintels, canopies, external steel staircases, railings, trapezoidal sheets and other steel and locksmith elements.
O2 Universum Prague
For the construction of this multifunctional arena we supplied more than 330 m of glass railings for the stands combined with a stainless steel strip, 180 m of stair railings, glass railings for escalators and other locksmith elements and steel structures.
The O2 universum is a multifunctional congress centre in Prague's Libeň, located next to the multipurpose hall O2 arena along Českomoravská Street. It is spread over four floors and has 21 halls with a total capacity of ten thousand visitors.
Praga Studios, Karlín Prague
The Praga Studios project was an unusual challenge for us. We were given the task of making and installing the main landmark of the building's atrium - the giant footbridges that today seem to float in space.
Our delivery included the steel structure of the roof with the beam to which the steel rods holding the footbridges are attached. The icing on the cake were the design railings with perforated sheet metal infill.
ELI Laser Centre
Abadia a. s. was the main supplier of steel and locksmith structures for the construction of the ELI Beams laser centre.
A significant delivery for this construction was the steel shielding structure - canopy. The canopy forms a defining architectural element of the entire building. For this reason, maximum demands were placed on the structure in terms of the visibility of the welded joints, detailing and surface finish.